What an IBM Power migration timeline looks like

A cloud-Power lift-and-shift typically runs 3–6 months from decision to cutover. Application-heavy programs take longer. Here are the phases.

A cloud-Power lift-and-shift typically runs 3–6 months from decision to cutover. An IBM i modernization or AIX-to-Linux replatform is a longer program, 9–18 months or more, because application work, not infrastructure, sets the pace. For a detailed phase-by-phase view of AIX specifically, see the AIX migration timeline.

The four phases

01

Discovery & assessment · weeks 1–4

LPAR and workload inventory, OS and hardware support dates, software/ISV licensing, RTO/RPO, and destination shortlist.

02

Design & pilot · weeks 4–10

Target sizing, network and connectivity design, a pilot LPAR migration, backup/DR approach, and go/no-go criteria.

03

Migrate & validate · weeks 10–22

Move non-production first, then production LPARs in waves, validating performance and integrations at each gate.

04

Optimize & close · weeks 22–26

Right-size capacity, confirm HA/DR, update runbooks, train the team, and decommission the old hardware.